RAILROAD PROJECT Overview

The Company’s flagship property is the Railroad-Pinion project located along the Piñon mountain range approximately 15 miles (24 kilometers) south-southeast of Carlin, Nevada, in the Railroad mining district. The Company controls a significant and largely contiguous land position of approximately 53,769 gross acres (21,760 gross hectares) in Elko County, NV. The Railroad-Pinion Project is an intermediate to advanced stage gold exploration project with a favorable structural, geological and stratigraphic setting situated at the southeast end of the Carlin Trend of north-central Nevada, adjacent to and south of Newmont Mining Corporation’s Rain Mining District. The Carlin Trend is a northwest alignment of sedimentary rock-hosted gold deposits where more than 40 separate gold deposits have been delineated in domed geological complexes with past production exceeding 80,000,000 ounces of gold. Each dome or “window” is cored by igneous intrusions that uplift and expose Paleozoic rocks and certain stratigraphic contacts that are favorable for the formation of Carlin-style gold deposits. The Railroad-Pinion Project is centered on the fourth and southernmost dome-shaped window on the Carlin Trend.

The core of the Piñon Range is comprised of an allochthonous and autochthonous sequence of Ordovician through Permian-age marine sedimentary rocks. Folds are present, but horst and graben structure developed within a framework of high-angle faults dominates the structure of the range. Tertiary sedimentary rocks deposited in shallow, fresh water lakes and overlying intermediate to felsic tertiary volcanic rocks are present on the flanks of the range and within surrounding grabens.

The Company initiated a 2018 Exploration and Development Program with the following objectives: (1) infill and development drilling at the Dark Star Deposit and Pinion Deposit to reduce drill spacing to approximately 30m and convert mineral resources to the Measured and Indicated categories; (2) exploration drilling at the Jasperoid Wash deposit to reduce drill spacings and provide requisite data for a maiden mineral resource estimate by the end of 2018; and (3) drilling to test new high-value targets at Dixie, the Dark Star Corridor, Ski Track and elsewhere within the Railroad District.

On September 20, 2018, the Company announced an expanded exploration and development plan for the remainder of 2018 and Q1,2019. The expanded exploration and development plan included 1) drill testing three new exploration targets; 2) further step out drilling at the Dark Star Deposit; 3) further step out drilling at the Jasperoid Wash Deposit; 4) completing the Dark Star Deposit and the Pinion Deposit resource updates in support of economic studies; and 5) expansion of development activities at the Dark Star Deposit and the Pinion Deposit.

The Company continues to gather information, and analyze and interpret such information, in order to investigate potential development opportunities for the Railroad-Pinion Project and consider whether to proceed directly to a PFS for the Railroad-Pinion Project.