    Outcropping Pinion Deposit Jasperoids

Pinion Drilling

The 2018 drilling program was the last reported drilling done at Pinion. It was mostly an infill and geotechnical program designed to reduce drill spacing to approximately 30 meters in critical portions of the deposit and provide additional core for metallurgical, geotechnical and HPGR test work.

Drill Hole Assay Tables*


*The gold intervals reported in these assay tables are based on a 0.14 gpt Au cut-off. Weighted averaging has been used to calculate all reported intervals. The reported gold intervals may, or may not represent true thicknesses and, or widths. In general, the gold distribution within these large, complex breccia bodies tends to be irregular and will require additional drilling to establish true widths. Sampling Methodology, Chain of Custody, Quality Control and Quality Assurance: All sampling was conducted under the supervision of the Company’s project geologists and the chain of custody from the project to the sample preparation facility was continuously monitored. A blank or certified reference material was inserted approximately every tenth sample. The North Dark Star core and RC samples were delivered to Bureau Veritas Mineral Laboratories preparation facility in Elko, NV. The samples are crushed, pulverized and sample pulps are shipped to Bureau Veritas certified laboratory in Sparks, NV or Vancouver, BC. Pulps are digested and analyzed for gold using fire assay fusion and an atomic absorption spectroscopy (AAS) finish on a 30-gram split. All other elements are determined by ICP analysis. Data verification of the analytical results includes a statistical analysis of the standards and blanks that must pass certain parameters for acceptance to insure accurate and verifiable results.

Please see disclaimer below.


© 2020 Gold Standard Ventures Corp.
All rights reserved.